Failed your emissions test?
With a clear plan for the follow-up measurement

Send us the measurement report. We look for the cause and tell you which measure will bring your plant back within the limits. Initial response usually within 24 hours.

Response within 24 hours

Assessment by engineers

Also for third-party housings

Documents for the authority

What matters now

After an exceedance, two clocks run at the same time: the deadline set by the authority and the delivery time of the technology. The second can be shortened, the first cannot.

Find the cause

An exceeded value rarely has only one cause. We read the measurement report together with operating hours, fuel and catalyst age before anything is ordered.

Document the measure

The authority expects a specific measure with design, schedule and expected result. That is exactly what we prepare as a document for you.

Hold the date

We plan backwards from the date of the follow-up measurement. If the regular delivery time is not enough, we look at cleaning, regeneration or an interim solution.

What you get from us

  • Assessment of your measurement report by an engineer, not by sales
  • Design of the required catalyst stage for your target value
  • Quotation with price, delivery time and required downtime window
  • Assessment of whether cleaning and regeneration are sufficient or a replacement is needed
  • A document you can submit to the authority as the planned measure
Hand holding a green leaf against a bright sky

The process in an urgent case

1

Send the report

Via the form or by email to office@pure-air.gmbh. A photo of the pages is enough to start.

2

Call back from engineering

Usually within 24 hours. We clarify the plant, operating hours, fuel and the date of your follow-up measurement.

3

Concept and quotation

Design, price, delivery time and downtime window in one document that the authority can also read.

4

Implementation before the follow-up

Manufacturing, installation and commissioning, scheduled for your follow-up measurement date.

Frequently asked questions in an urgent case

No. The initial assessment is free of charge and without obligation. We only invoice what you actually order.
Then we discuss alternatives before you have to postpone a date. An existing catalyst can often be restored through cleaning and regeneration to the point where the values are met again. If that will not work, we tell you clearly.
Yes. We manufacture or source elements that fit precisely into housings from other manufacturers. You need neither a new housing nor the original supplier.
The measurement report, the plant type with output and the fuel. We clarify everything else in a conversation. If something is missing, it will not hold you up.

Send measurement report

If it is urgent, call us directly. After submitting the form, send the measurement report as a PDF or photo to office@pure-air.gmbh.

Mobile +49 170 9630471
Phone +49 951 96433250
Pure Air GmbH, Am Börstig 12, 96052 Bamberg, Germany